목차 1.-Introduction 2.-Fisheries 3.-Manufacture -Work
Station(CH.4) -P-Chart
(CH.6) 4.-Distribution -Loex&3PL -Centroid
(CH.9) 5.-Conclusion
본문 Dongyoung Cold Plaza -Size :
1,500-pyeong
Factory facilities -80,000tons of refrigerating
facilities -12,000-ton cold store
☞Capable of processing up to 50
tons/year
Total Time = 160 sec About 100 tuna cans can be produced
per tuna → Assume a whole tuna as a unit
Total Time = 160
seconds
The factory is operated 10 hours/day 418 tunas/day to meet the
demand forecast
Cycle Time = Production Time/day Required
output/day
= 60sec * 600 min 418 tunas = 86.12 sec
N = Sum
of task time (T) Cycle time (C)
=160sec 86.12sec = 1.8 ≒ 2
stations
Efficiency = Sum of task time Actual # of workstation *
Cycle time
= 160 / 2*86.12 =92.89%
Delivery
Service Decrease distribution cost Maximize delivery
effectiveness Minimize delivery time
Distributing &
Manufacturing Service Manages productivity Stickers/tags on the
finished imported goods
Transport Service Developed advanced
transportation system through the best quality trucks
Distribution Consulting Service Constructed DW’s
Centroid Established efficiency in distribution management
operation
Central Operation Service Manages inventory service
system Controls temperature for storage & delivery trucks Supervise
warehouse &
shipment
본문내용 6) -Distribution Loex&3PL Centroid
(CH.9) -Conclusion PAGE:4 P- CHARTS WORK STATION FISHERIES INTRO CENTROID CONCLUSION Company
Information 3PL LOEX PAGE:5 “참치도 동원이죠” Who’s Leader In Tuna
Market? P- CHARTS WORK STATION FISHERIES INTRO CENTROID CONCLUSION Over
70 % Market Share 3PL LOEX PAGE:6 DW’s Products Symbol of
Dongwon! P- CHARTS WORK STATION FISHERIES INTRO CENTROID CONCLUSION
3PL LO |
댓글 없음:
댓글 쓰기