본문 Dry Storage Bins :
4000~6000(bbl/hr)
Wet Storage Bins : 1200~3200(bbl/hr)
Total wet
berries : app. 19,000
Arrival of wet berries : 19,000 bbls * 70%=
13,330 bbls
Needed Operation time : 13,330 bbls/600 bbls/hr =
22.2hr
Wet berries to be processed : 13,330 bbls/11hr= 1,210
bbls/hr
Inventory rate of wet berries : 1,210–600= 610
bbls/hr
Max inventory : 610 bbls/hr*11hr= 6,710 bbls
The time
that the truck queue begins : 3,200 bbls/610 bbls/hr = 5.25hr
◆
Cost analysis
▪Benefits(Overtime saving costs)
-
Low-volume period : (6+1+10+8+1) * $3.75 * 5.6(hrs) = $546 → $546 * 85(days)
= $46,410
- High-volume period : (6+1+10+8+1) * $3.75 * 5.6(hrs) =
$546 - High-volume period : (9+5+12) * $2.25 * 1.5(overtime rate) * 5.6(hrs)
= $491.4 → ($546 + $491.4) * 21(days) = $21,785.4 - Total :
$68,195.4
본문내용 . Creative solutions 5.
Q&A
Q&A Introduction Creative solutions Q&A “What
if” solutions Case Analysis 1. Introduction Weigh, Test
Berries Kiwanee Dumps (5) Cap. = 450 bbl/hr each, or 2,250 bbl/hr
total Truck Queue Dry Storage Bins 17-24, 1-16 4,000-6,000
bbl Destone (3) 4,500 bbl/hr Dechaff (2) 3,000 bbl/hr Dechaff
(1) 1,500 bbl/hr Wet Storage Bins 17-24 & 25-27 1,200-3,200
bbl Trucks Inspection |