생산관리 National Cranberry Cooperative(NCC) 사례분석(영문)

생산관리 National Cranberry Cooperative(NCC) 사례분석(영문)
[생산관리] National Cranberry Cooperative(NCC) 사례분석(영문).pptx


목차
1. Introduction
2. Case Analysis
3. “What if” solutions
4. Creative solutions
5. Q&A


본문
Dry Storage Bins : 4000~6000(bbl/hr)

Wet Storage Bins : 1200~3200(bbl/hr)

Total wet berries : app. 19,000

Arrival of wet berries
: 19,000 bbls * 70%= 13,330 bbls

Needed Operation time
: 13,330 bbls/600 bbls/hr = 22.2hr

Wet berries to be processed
: 13,330 bbls/11hr= 1,210 bbls/hr

Inventory rate of wet berries
: 1,210–600= 610 bbls/hr

Max inventory
: 610 bbls/hr*11hr= 6,710 bbls

The time that the truck queue begins
: 3,200 bbls/610 bbls/hr = 5.25hr


◆ Cost analysis

▪Benefits(Overtime saving costs)

- Low-volume period : (6+1+10+8+1) * $3.75 * 5.6(hrs) = $546
→ $546 * 85(days) = $46,410

- High-volume period : (6+1+10+8+1) * $3.75 * 5.6(hrs) = $546
- High-volume period : (9+5+12) * $2.25 * 1.5(overtime rate) * 5.6(hrs) = $491.4
→ ($546 + $491.4) * 21(days) = $21,785.4
- Total : $68,195.4


본문내용
. Creative solutions
5. Q&A

Q&A
Introduction
Creative
solutions
Q&A
“What if”
solutions
Case
Analysis
1. Introduction
Weigh,
Test Berries
Kiwanee Dumps (5)
Cap. = 450 bbl/hr
each, or
2,250 bbl/hr total
Truck
Queue
Dry Storage Bins
17-24, 1-16
4,000-6,000 bbl
Destone (3)
4,500 bbl/hr
Dechaff (2)
3,000 bbl/hr
Dechaff (1)
1,500 bbl/hr
Wet Storage Bins
17-24 & 25-27
1,200-3,200 bbl
Trucks
Inspection
 